[tex-live] TL13 status
Philip TAYLOR
P.Taylor at Rhul.Ac.Uk
Tue Apr 9 21:31:55 CEST 2013
Mojca Miklavec wrote:
> On Tue, Apr 9, 2013 at 12:21 AM, Philip TAYLOR wrote:
>>
>> What is necessary is to encourage developers to focus
>> solely on bug-fixes during the pre-DVD freeze, and to resume
>> development work only once that freeze is over.
>
> Do you mean bug-fixing mode for 6 months, twice per year? ;)
If it takes six months to fix all the bugs, then yes; but
my assumption was that the pre-DVD freeze would start (say)
one month before intended production, and that month would
be used for bug fixing. If less time is needed, great; and
if more time is needed, so be it : better a bug-free DVD
than a buggy one followed by a need for an immediate network
update, particularly for those with poor or no network connectivity.
** Phil.